Overland Conveyor Systems – Coal Handling

Overland Conveyor Systems – Coal Handling

A large coal mining operation in south eastern British Columbia contracted Belterra to remove an existing overland system so the coal under the conveyor could be reclaimed. In less than 48 hours Belterra personnel removed and rolled up more than 6000 ft. (x 42”) of conveyor belt. After 10 days of mining, the system was rebuilt and the belting was installed, spliced, and vulcanized in less than four days.